Invest with clear eyes
A structure you can understand, numbers you can test, and the risks written down.
How it works
- Choose the structureForeign investors typically hold through a PT PMA company, a leasehold or Hak Pakai. The right route depends on your situation and is confirmed by an independent notary.
- Verify the landTitle, boundaries, zoning and permits are checked before design is locked and before funds are committed.
- Follow the buildPhased construction, with progress reports tied to the schedule and cost plan.
- Receive reportingOnce open, owners receive monthly financial reports from the operating team.
Test the Areguling Hills assumptions
Change the room rates and occupancy to see how the planning projection moves. Investment cost is fixed at Rp 51.7 billion excluding land; revenue from food, beverage and spa is 25% of room revenue; operating profit is 42% of revenue less a 7% reserve.
Illustration only. Not a forecast or a guarantee.
The risks, written down
Ground and slope
Cracks and erosion channels on the slope mean the geotechnical survey decides retaining-wall cost and the final layout.
Permits and timing
Permits take time and are the largest schedule risk after geotechnics.
Water supply
Fresh water is limited in South Lombok; borehole or tanker supply and rainwater storage are part of the plan.
Market and costs
Rates, occupancy and build costs are assumptions until validated by contractors and a market consultant.
Talk to us before you decide
We will walk you through the dossier, the structure options and the open questions.